Premium Electrical Work — Done Right
Six focused offerings with the same gold-standard finish: neat, safe, and built to last.
Full Rewire
Complete rewires with tidy routing, clear labelling, and certification—future-ready and compliant.
Book Now
Fuse Board Upgrade
Modern consumer units with RCD/RCBO protection, neat finish, and full test results.
Book Now
Smart Light Upgrade
Elegant scenes, app control, and energy-efficient fittings—installed cleanly and discreetly.
Book Now
EV Installation
Home and workplace chargers supplied, installed and commissioned to OZEV guidance.
Book NowService FAQs
Rewire How long does a full rewire take?
Typical 2–5 days for a 3-bed property depending on access and finish level. We protect surfaces, keep areas tidy, and schedule power-off periods to suit you.
Rewire Do I need to move out during a rewire?
Not always. Many rewires can be staged so you can stay at home. We’ll advise after a survey if temporary relocation would be more comfortable.
Fuse Board How long does a consumer unit (fuse board) upgrade take?
Usually half a day to a full day. It includes safety testing, clear labelling, and certification on completion.
Fault Finding What happens during a fault-finding visit?
We run targeted tests to isolate the issue, explain options, and aim to fix on the first visit when parts are available.
Smart Lights Will smart switches work with my existing wiring?
Many smart switches require a neutral at the switch. If not present, we can fit inline modules, reconfigure switching, or advise a neat rewire section.
Solar Do you install batteries and monitoring?
Yes—PV with optional battery storage and app-based monitoring. We’ll size the system to your usage and roof.
EV Do you handle load management and certification?
Yes—we assess main supply/load, set limits where needed, install neatly indoors or outdoors, and provide certification.
